Communicate with Supplier? Supplier
Maggie Wang Ms. Maggie Wang
What can I do for you?
Chat Now Contact Supplier

Shandong Hengwang Group Co., Ltd

All
  • All
  • Title
All
  • All
  • Title
HomeProductsPile DriverGuardrail Pile DriverGuardrail pile driver piling machine
Guardrail pile driver piling machine
Guardrail pile driver piling machine
Guardrail pile driver piling machine
Guardrail pile driver piling machine
Guardrail pile driver piling machine
  • Guardrail pile driver piling machine
  • Guardrail pile driver piling machine
  • Guardrail pile driver piling machine
  • Guardrail pile driver piling machine
  • Guardrail pile driver piling machine

Guardrail pile driver piling machine

    Payment Type: L/C,T/T,Money Gram,Western Union
    Incoterm: FOB,CFR,CIF
    Min. Order: 1 Set/Sets
    Delivery Time: 7 Days

Basic Info

Type: Vibratory Pile Hammer

Pressure Pile Driver Type: Hydraulic Pile Driver

Pile Hammer Type: Hydraulic Hammer

Power Source: Diesel

Motor Power: 33kw

Noise: Without Noise

Certification: ISO 9001:2000, ISO 9001:2008

Condition: New

Dimension(L*W*H): 2500*1800*3400mm

Pile Height: 2.8m

Working Pressure: 16mpa

Drill Diameter: 90-200mm

Speed Of Drill: 250mm

Air Working Pressure: 0.7-1mpa

Flow Rate Of Hydraulic Pressure Hammer: 30-50L/min

Impactor Frequency: 900times/min

Additional Info

Packaging: container

Transportation: Ocean,Land

Port: Qingdao,Shanghai,Guangzhou

Product Description

Hydraulic Auger Crane Pilling Machine/ Power Highway Guardrail Pile Driver

Product Application

This hydraulic Pile Driver is a kind of Construction Machinery which can converte hydraulic energy into mechanical energy . It is mainly used in construction of steel pipe piles of highway guardrails. The solar spiral pile is spiraling down into the ground, and the ground is drilled with different drills.




Product Parameters:

Item
Parameter
Engine power
33~37KW
Net weight
2300kg
Dimension(L*W*H)
2500*1800*3400mm
pile height
2.8m
Working pressure
16Mpa
Drill diameter
90~200mm
Speed of drill
250mm
Air working pressure
0.7~1.0Mpa
hydraulic hammer frequency
350-780times/min
Flow rate of hydraulic pressure hammer
30~50L/min
Drill depth
1.8m
Impactor frequency
900times/min
Pile driverPilling machineGuardrail Pile Driver

Packing&Shipping:

shipping





certificate

work shop


visit


exhibation

FAQ:

1.Are you factory?

A: We are factory and trading company,we are professional manufacturer of solar pile driver ,Highway guardrail pile driver,hydraulic water well drilling rig,Pneumatic Water well drilling rig etc.


2.What brand of the machinery can we supply?
A: HW, Sem, XCMG, ZGYX brand etc.


3.What kind terms of payment can be accepted?
A:Normally we can work on T/T term or L/C term.


4.What about the warranty time?
A:12 months after shipment, excluding wearing parts, We offer these parts with lowest price at any time.


5.How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock or it is 15-25 days if the goods are not in stock, it is according to quantity.


6.Our after services:
Our sales team will response for your question within 24 hours. (Holidays Excluded)
Technical support will be available at any time.
Free replacement will provide once the failure confirmed caused by our product quality.


7.Shipping way

By air or by sea as you required.


Looking for ideal Pile Driver Manufacturer & supplier ? We have a wide selection at great prices to help you get creative. All the Piling Machine are quality guaranteed. We are China Origin Factory of Guardrail Pile Driver. If you have any question, please feel free to contact us.

Product Categories : Pile Driver > Guardrail Pile Driver

Email to this supplier
  • Maggie WangMs. Maggie Wang
  • Your message must be between 20-8000 characters

Maggie Wang

Ms. Maggie Wang

SEND INQUIRY

  • Tell:

    86-021-58321600

  • Fax:

    86-021-58321600

  • E-mail:

    maggie@hengwangjx.com