Communicate with Supplier? Supplier
Maggie Wang Ms. Maggie Wang
What can I do for you?
Chat Now Contact Supplier

Shandong Hengwang Group Co., Ltd

All
  • All
  • Title
All
  • All
  • Title
HomeProductsPile DriverGuardrail Pile DriverLoad type Road guardrail drill machine
Load type Road guardrail drill machine
Load type Road guardrail drill machine
Load type Road guardrail drill machine
Load type Road guardrail drill machine
Load type Road guardrail drill machine
Load type Road guardrail drill machine
  • Load type Road guardrail drill machine
  • Load type Road guardrail drill machine
  • Load type Road guardrail drill machine
  • Load type Road guardrail drill machine
  • Load type Road guardrail drill machine
  • Load type Road guardrail drill machine

Load type Road guardrail drill machine

    Payment Type: L/C,T/T,Money Gram,Western Union
    Incoterm: FOB
    Min. Order: 1 Set/Sets
    Delivery Time: 10 Days

Basic Info

Model No.: lh360

Type: Vibration Piling Machine, Pile Driver Machine

Pressure Pile Driver Type: Hydraulic Pile Driver

Pile Hammer Type: Hydraulic Hammer

Power Source: Diesel

Motor Power: 44kw

Noise: With Noise

Certification: ISO 9001:2000, CE

Condition: New

Name: Guardrail Drill Machine

Power: 37KW

Impactor: 110/150 Low Air Pressure

Drilling Diameter: 110-200cm

Drilling Depth: 1.4-2.6m

Left And Right Journey: 40-70cm

Size: 5*2.2*2.74m

Weight: 4000kg

Color: Yellow

Additional Info

Packaging: Standard package

Productivity: 10000sets/year

Brand: HW

Transportation: Ocean

Place of Origin: Shandong

Supply Ability: 4000kg

Certificate: iso

HS Code: 8430100000

Port: Qingdao,Shanghai,Niningbo

Product Description

Loaded road Guardrail Pile Driver road guardrail Drilling Machine
1. guardrail Drill Machine Main structure and working principle;
The loaded guardrail Pile Driver has a good overall layout, compact structure, reasonable center of gravity layout and good stability. The guardrail drill machine body and the walking system have better buffering effect, advanced product performance, high work efficiency, comfortable operation, and key components are used in the joint environment, which can be used as an ideal equipment for construction with harsh working environment.
In addition, the guardrail drill machine high-power engine and the enclosed rear bin extend the service life of the engine, and the construction time is greatly lengthened, the power is large, and the working ability is strong. The key components such as the engine, the box, the bridge and the hydraulic system are all made of reliable components, which improves the reliability of the whole machine.
2, guardrail drill machine use and scope of use;
Load-type guardrail pile driver is a piling drilling machine widely used in highway, railway, construction, hydropower, port and other construction projects. In recent years, Hengwang has been repairing both inside and outside of piling production, and has obtained cover and gearbox selection. A major breakthrough in the quality of components, product sales continue to rise, in the product technology and product services to the forefront of the industry.

Loading guardrail pile driver_01Loading guardrail pile driver_02Loading guardrail pile driver_03

guardrail drill machine

Power Head 65
Power 37KW
Impactor 110/150 Low air pressure
Drilling Diameter 110-200cm
37kw 37kw
Drilling Depth 1.4-2.6m
left and right journey 40-70cm
Size 5*2.2*2.74m
Weight 4000kg

Loading guardrail pile driver_04

Loading guardrail pile driver_05Loading guardrail pile driver_06Loading guardrail pile driver_07Loading guardrail pile driver_08

Packing&Shipping:

shipping





certificate

work shop


visit


exhibation

FAQ:

1.Are you factory?

A: We are factory and trading company,we are professional manufacturer of solar pile driver ,Highway guardrail pile driver,hydraulic water well drilling rig,Pneumatic Water well drilling rig etc.


2.What brand of the machinery can we supply?
A: HW, Sem, XCMG, ZGYX brand etc.


3.What kind terms of payment can be accepted?
A:Normally we can work on T/T term or L/C term.


4.What about the warranty time?
A:12 months after shipment, excluding wearing parts, We offer these parts with lowest price at any time.


5.How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock or it is 15-25 days if the goods are not in stock, it is according to quantity.


6.Our after services:
A:Our sales team will response for your question within 24 hours. (Holidays Excluded)
Technical support will be available at any time.
Free replacement will provide once the failure confirmed caused by our product quality.


7.Shipping way

A:By air or by sea as you required.



Looking for ideal Guardrail Drill Machine Manufacturer & supplier ? We have a wide selection at great prices to help you get creative. All the Road Guardrail Drill are quality guaranteed. We are China Origin Factory of Load Type Guardrail Drill. If you have any question, please feel free to contact us.

Product Categories : Pile Driver > Guardrail Pile Driver

Email to this supplier
  • Maggie WangMs. Maggie Wang
  • Your message must be between 20-8000 characters

Maggie Wang

Ms. Maggie Wang

SEND INQUIRY

  • Tel:

    86-021-58321600

  • Fax:

    86-021-58321600

  • E-mail:

    maggie@hengwangjx.com